|
This bore was drilled on a suburban block on top of a ridge in Harare, Zimbabwe. Soft shale was encountered all the way down to 50m, where it firmed up just as we hit water, which turned everything to mud. The hole was cased and gravel packed to 50m and then drilled further to 62m and developed. The end result was 40L/min of good clean water and a very happy customer (despite the mess, which we did clean up!).
|